Taipei Metro VAL 256

Taipei Metro VAL 256

Three VAL 256 EMUs at reverse siding near Zhongshan Junior High School Station on the Wenshan Line, March 2008

Interior of a VAL 256 coach
In service 1996-present
Manufacturer Matra/GEC Alsthom (Batch 1),
Bombardier (Batch 2)
Family name VAL
Constructed c.1990-1993 (Batch 1)
2006-2009 (Batch 2)
Number built 303 cars
(75 trains + 3 surplus cars)
Formation 4 cars per trainset
Capacity 24 seats,
90 standing per car
Operator Taipei Rapid Transit System
Depot(s) Muzha, Neihu
Line(s) served Taipei Metro Brown Line
(Wenshan Line and Neihu Line)
Specifications
Car length 13,780 mm
Width 2,560 mm
Height 3,510 mm
Maximum speed 80 km/h
Weight 148 tonnes
Electric system(s) 1500 V Third-rail DC
Safety system(s) ATC (CBTC)
Gauge 1,435 mm (4 ft 8 12 in) Standard gauge

The Taipei Metro VAL 256 is a medium capacity rapid transit EMU operated on the Taipei Rapid Transit System.

The VAL 256 was the first trainset to enter service on the Taipei Metro in 1996 (followed by the C301 cars later that year). VAL 256 cars are capable of driverless operation, as of all other trainsets.

The first 101 cars were built by the Matra conglomerate (with GEC Alsthom) from circa 1990 to 1993 as part of the VAL family of automated rubber-tired trainsets, and entered service three years later. Within a year of revenue operations, Matra terminated the service contract, removing all maintenance crew. They filed and won a complaint against the Taipei City Government over contract delay compensations. All the while, the VAL256 trains continued service for twelve years, serviced by TRTC engineers and Academia Sinica researchers.[1] They featured fixed-block ATC/ATO systems for driverless and manual operation,[2] which was replaced by Communication-based train control (CBTC) in 2006-2009.[1]

In June 2003, Bombardier Transportation was contracted to extend the Muzha/Wenshan line into Neihu. This involves building 202 new cars, the track signaling system, and overhauling the Matra cars to function under the new system.

The Bombardier trains were built from 2006 to July 4, 2009.[1] Integration of the Bombardier-built cars with the Matra-built cars was a daunting task, the consequences of which were multiple system malfunctions and failures along the Wenshan and Neihu Lines.[3]

Each four-car train is formed by two coupled two-car trainsets. Any two sets can be coupled, and their numbers do not need to be consecutive (unlike the heavy-capacity trains).

The VAL256 train sets have served the Muzha Line from 1996 to 2009. The trains were taken offline for 17 months for control system upgrades, and is to resume service in December 2010.

See also

References

  1. ^ a b c Taipei Metro – Approaches and strategies in managing an extensive and diverse rail framework, Richard C.L. Chen, TRTS, retrieved 26 April 2008
  2. ^ http://www.trtc.com.tw/e/future.asp?catid=%E9%97%9C%E6%96%BC%E6%88%91%E5%80%91&small=%E8%B7%AF%E7%B6%B2%E8%88%87%E7%B3%BB%E7%B5%B1#Systems. Retrieved 2009-10-01. Notice, however, that the link says the VAL 256 trains are still controlled by off-board computers, which is no longer the case now.
  3. ^ "Neihu, Muzha MRT lines closed down for 4 hours". Taiwan News Online. 2009-08-06. http://www.etaiwannews.com/etn/news_content.php?id=1024694. Retrieved 2009-08-12.